Water and Wastewater Treatment Systems Design and Construction

Nanofiltration Process Expansion Study

  • City of Pompano Beach

Reclaimed Water Treatment Plant Modifications

  • City of Pompano Beach

Water Treatment Plant Washwater Recovery Upgrades

  • City of Boca Raton

Membrane Element Replacement

  • City of Pompano Beach
Tanks and building

Lime Softening Chemical Building Renovation Study

  • City of Boca Raton

Lime Softening Unit Replacement

  • City of Pompano Beach
Seminole Tribe of Florida new pumps

Water Treatment Plant Raw Water Supply Improvements

  • Seminole Tribe of Florida
Site overview

Water Treatment Plant 3A Four Log System

  • Broward County
Water treatment plant

Holiday Park Lead and Copper Study

  • Broward County
Process schematic

Potable Water System Interconnect

  • City of Pompano Beach
Broward County Pump Station 3A Four-Log Virus Treatment

Pump Station 3A Four-Log Virus Treatment

  • Broward County
Pumps

Alternative Water Supply Master Plan

  • Broward County
System water map

Unidirectional Flushing and Valve Exercising Program

  • City of Pompano Beach
Membranes

40 mgd Nanofiltration Membrane Element Replacement

  • City of Boca Raton
Membrane skids

10.0 mgd Membrane Pressure Vessel Replacement

  • City of Pompano Beach
Membrane skid

10.0 mgd Nanofiltration Membrane Replacement

  • City of Pompano Beach

40.0 mgd Membrane Softening Process Addition

  • City of Boca Raton