Regulatory Compliance
![](http://www.mcbrinson.com/wp-content/uploads/2022/11/P-14-final-300x169.jpg)
Reclaimed Water Treatment Plant Modifications
- City of Pompano Beach
![](http://www.mcbrinson.com/wp-content/uploads/2023/05/McCafferty-Brinson-Consulting-Wash-Water-Recovery-Upgrade-Camera-April_22_2023_12_00_00_PM-300x200.jpg)
Water Treatment Plant Washwater Recovery Upgrades
- City of Boca Raton
![](http://www.mcbrinson.com/wp-content/uploads/2023/05/FB2-P3D-300x205.png)
Four-Log Virus Treatment Reassessment and Demonstration
- City of Boca Raton
![](http://www.mcbrinson.com/wp-content/uploads/2021/11/B-17-Photo-300x176.jpg)
Membrane Pretreatment Pressure Filter System Expansion
- City of Boca Raton
![](http://www.mcbrinson.com/wp-content/uploads/2021/11/B-16-Photo-300x183.png)
Country Club Village Infrastructure Improvement Design (iSIP)
- City of Boca Raton
![](http://www.mcbrinson.com/wp-content/uploads/2022/11/P-13-Photo-300x225.jpg)
Membrane Element Replacement
- City of Pompano Beach
![](http://www.mcbrinson.com/wp-content/uploads/2020/05/Picture2-1-300x238.png)
Consent Order Corrective Action Engineering Report
- City of Clewiston
![](http://www.mcbrinson.com/wp-content/uploads/2022/11/WIN_20210211_11_24_36_Pro-300x169.jpg)
Wastewater Treatment Plant Annual Updated Capacity Analysis Report
- City of Clewiston
![](http://www.mcbrinson.com/wp-content/uploads/2021/11/B-12-Photo-300x169.jpg)
Water Treatment Plant Recarbonation System Replacement
- City of Boca Raton
![Site overview](http://www.mcbrinson.com/wp-content/uploads/2018/07/SiteVisitPhoto-300x225.png)
Water Treatment Plant 3A Four Log System
- Broward County
![](http://www.mcbrinson.com/wp-content/uploads/2021/11/B-9-Photo-300x169.jpg)
Rehabilitation of the Membrane Pretreatment Pressure Filters
- City of Boca Raton
![Water treatment plant](http://www.mcbrinson.com/wp-content/uploads/2018/07/WTP-picture-300x176.jpg)
Holiday Park Lead and Copper Study
- Broward County
![Piping and meter](http://www.mcbrinson.com/wp-content/uploads/2017/06/P-9-300x225.jpg)
Water and Reclaimed Water Treatment Plant Flow Meter Replacement
- City of Pompano Beach
![Process schematic](http://www.mcbrinson.com/wp-content/uploads/2017/06/Capture-300x115.jpg)
Potable Water System Interconnect
- City of Pompano Beach
![Broward County Pump Station 3A Four-Log Virus Treatment](http://www.mcbrinson.com/wp-content/uploads/2016/10/DSC00920-e1685039882972-300x220.jpg)
Pump Station 3A Four-Log Virus Treatment
- Broward County
![Pumps](http://www.mcbrinson.com/wp-content/uploads/2018/03/Broward-County-Water-and-Wastewater-Master-Plan-1-300x225.jpg)
Alternative Water Supply Master Plan
- Broward County
![System water map](http://www.mcbrinson.com/wp-content/uploads/2013/12/System-Map-300x204.jpg)
Unidirectional Flushing and Valve Exercising Program
- City of Pompano Beach
![Sodium hydroxide tanks](http://www.mcbrinson.com/wp-content/uploads/2014/10/DSCF4079-300x227.jpg)
Replacement of Sodium Hydroxide Tanks and Miscellaneous Improvements
- City of Boca Raton
![Pumps](http://www.mcbrinson.com/wp-content/uploads/2013/12/DSCF3690-300x193.jpg)
30.5 mgd Water Treatment Plant Membrane Conversion Chemical Systems
- Seacoast Utility Authority
![Membranes](http://www.mcbrinson.com/wp-content/uploads/2013/12/skid-300x198.jpg)
40 mgd Nanofiltration Membrane Element Replacement
- City of Boca Raton
![Water treatment plant](http://www.mcbrinson.com/wp-content/uploads/2013/12/Boca-WWTP-Stock-13-300x198.jpg)
Continuing Nanofiltration Process Optimization Services
- City of Boca Raton
![Membrane skids](http://www.mcbrinson.com/wp-content/uploads/2013/12/blue-hills-photo-300x224.jpg)
6.0 migd Blue Hills Seawater Water Treatment Plant
- Water and Sewerage Corporation of the Bahamas
![Membrane skids](http://www.mcbrinson.com/wp-content/uploads/2013/12/skids-edit_edited-21-300x213.jpg)
10.0 mgd Membrane Pressure Vessel Replacement
- City of Pompano Beach
![Membrane skid](http://www.mcbrinson.com/wp-content/uploads/2013/12/SKIDS-2-300x224.jpg)
10.0 mgd Nanofiltration Membrane Replacement
- City of Pompano Beach
![Storm water gate](http://www.mcbrinson.com/wp-content/uploads/2013/12/Picture-10-300x147.png)
FDOT Outfall and Stormwater Facility Inspections
- Florida Department of Transportation
![Reverse Osmosis Membrane](http://www.mcbrinson.com/wp-content/uploads/2013/11/Picture-38-300x206.png)
3.0 mgd LPRO Treatment, Raw Water Wells and Deep Well Injection Plant
- City of Clewiston
![](http://www.mcbrinson.com/wp-content/uploads/2022/11/B-0-Photo-300x183.jpg)
40.0 mgd Membrane Softening Process Addition
- City of Boca Raton