Pilot Studies, Start-Up, and Treatment Process Optimization, Regulatory Compliance, Water and Wastewater Treatment Systems Design and Construction
Seacoast Utility Authority
July 31, 2014
MBC was responsible for design of pre- and post-treatement chemical systems, as well as startup assistance for a 26 mgd nanofiltration process in parallel with a 3.5 mgd low pressure reverse osmosis membrane process.