Stormwater Inspection, Permitting, and Compliance
Florida stormwater regulations require Best Management Practices (BMPs) to be implemented before and after construction to manage erosion, sedimentation buildup, and runoff. MBC provides implementation and compliance services on stormwater permitting and regulations, including National Pollutant Discharge Elimination System (NPDES) permitting.
MBC performs outfall and stormwater facility inspections to identify maintenance deficiencies. These inspections include visual observations, measurements, photographs, and documentation of any issues or problems that need to be addressed. The inspections include finding their exact locations using GPS devices and maps and identifying sizes, and types of material, such as the diameter, length, shape, and type of pipes, culverts, or structures, updating the facilities inventory in the GIS database and preparing reports based on the inspection results, including the location, size, type, condition, and recommendations for each outfall and stormwater facility inspected.