Skip to content
  • Home
  • About Us
    • Our Advantage
    • Careers
    • Certifications
  • Services
    • Potable Water Design
    • Construction Services
    • Planning & Studies
    • Regulatory Compliance
    • Wastewater & Reclaimed Water
    • Funding Procurement & Compliance
    • Litigation Support
  • Projects
    • Engineering Design
    • Potable Water
    • Construction Services
    • Facility Planning & Studies
    • Facility Startup & Treatment Process
    • Regulatory Compliance
    • Wastewater & Reclaimed Water
    • Funding
  • Publications
  • News
  • Contact Us
  • MBC Portal

Construction Services

Procurement of SRF Funding and Compliance Services During Construction of Water System Interconnect Upgrades

Reclaimed Water Treatment Plant Modifications Design and Services During Construction

Country Club Village Infrastructure Improvement Design (iSIP)

Membrane Element Replacement

Pompano Beach Lime Softening Unit Replacement

WTP Recarbonation System Replacement Design and Services During Construction

Site overview

Broward County Water and Wastewater Services WTP 3A Four Log System Services During Construction

Sodium hydroxide tanks

Replacement of Sodium Hydroxide Tanks and Miscellaneous Improvements, Design and Construction

Pumps

30.5 mgd WTP Membrane Conversion Chemical Systems Design and Plant Start-Up

Membranes

40 mgd Nanofiltration Membrane Element Replacement

Water tanks

Rehabilitation of Steel Elevated Storage Tanks, Design and Construction

Boca water tower

Demolition of Steel Elevated Storage Tank Design and Construction Services

Membrane skids

10.0 mgd Membrane Pressure Vessel Replacement

Wastewater Treatment Plant Oxygen Generation System Upgrade Design-Build

Water Ground Storage Tanks, Design and Construction Services

Reverse Osmosis Membrane

3.0 mgd LPRO Treatment, Raw Water Wells and Deep Well Injection Plant

40.0 mgd Membrane Softening Process Addition