Nanofiltration Process Expansion Study

Evaluation and development of a conceptual phasing plan for expansion of the city’s existing 10.0 mgd nanofiltration process to an ultimate capacity of 30 mgd, including phasing out the existing lime softening process.

Holiday Park Lead and Copper Study

Water treatment plant

This project included performance of desk-top study, and in-situ coupon testing. Design and installation of a corrosion inhibitor bulk storage and feed system.  

Pump Station 3A Four-Log Virus Treatment

Broward County Pump Station 3A Four-Log Virus Treatment

This project included preparation and submittal of a four-log virus treatment of groundwater. MBC also prepared construction drawings and permitting applications.    

Alternative Water Supply Master Plan

Pumps

This project included an analysis of potable water treatment source of supply, establishing operational goals, growth forecasts, water systems modeling, recommending improvements, and submittal of the master plan