10.5 mgd West WTP Reverse Osmosis Improvements

Project description

This project included the addition of two 1.5 mgd Low Pressure Reverse Osmosis (LRPO)  units for a total capacity of 3.0 mgd, a product water degasifier, and chemical post-treatment.

DOWNLOAD PROJECT PROFILE

Project details

Client:

City of Deerfield Beach, MBC Subconsultant to Prime Consultant

Date:

08/2009

Comments are closed.