Disinfection and Finished Water Blending Yard Piping Improvements

Project description

This project included replacement of the existing gas chlorine system with a 12% sodium hypochlorite storage and feed system, piping modifications to blend the membrane permeate with the lime softened water, and disinfection of the blended water to comply with the 4-log virus treatment requirement under Chapter 62-555.320, Florida Administrative Code and the Federal Groundwater Rule (GWR).

 

DOWNLOAD PROJECT PROFILE

Project details

Client:

City of Pompano Beach, MBC Subconsultant to Prime Consultant

Date:

06/2011