Membrane Pretreatment Pressure Filter System Expansion Design
This project included engineering design, permitting, and bidding services for the addition of two pressure filter units.
This project included engineering design, permitting, and bidding services for the addition of two pressure filter units.
This project included replacement of membranes and pilot testing of the new membranes.
This project included design, bidding and construction services.
This project included design. permitting,and bidding. MBC will provide engineering services during construction.
This project included analyzing alternative installation configurations for the flow meters and determining the best fit configuration to improve system operation and simplify maintenance.
This project included preparation and submittal of a four-log virus treatment of groundwater. MBC also prepared construction drawings and permitting applications.
Preparation of Compliance Studies analyzing treatment process and recommending process modifications, desk-top laboratory treatability studies, design and construction administration for implementation of recommended process improvements, and preparation of Demonstration submittals to regulatory agencies.
This project included replacement of two existing 6,000-gallon sodium hydroxide bulk storage tanks, pumps, piping, magnetic flow meters, and relater systems.
MBC was responsible for design of pre- and post-treatement chemical systems, as well as startup assistance for a 26 mgd nanofiltration process in parallel with a 3.5 mgd low pressure reverse osmosis membrane process.
In 2004, the City completed construction and commissioning of the 40 mgd NF membrane process addition to the City’s 70 mgd WTP. The original membrane elements for the plant were specially developed for the 2004 project by the membrane the membrane manufacturer, Hydranautics, which subsequently became the ESNA LF (low fouling) product line, the industry … Read more