Consent Order Corrective Action G

This project included preparation of two Engineering Reports that evaluate violations documented in the 2nd Amended Consent Order and provide recommendations to prevent future such violations    

Holiday Park Lead and Copper Study

Water treatment plant

This project included performance of desk-top study, and in-situ coupon testing. Design and installation of a corrosion inhibitor bulk storage and feed system.  

Spill Prevention and Control Countermeasure (SPCC) Plans

Wheelabrator building

Wheelabrator operates four waste-to-energy facilities in Florida.  Two South Florida and one Central Florida (Tampa) facilitates provide disposal of municipal solid waste while creating renewal electricity for sale to the local utility.  The fourth facility also located Central Florida (Auburndale) provides disposal of waste wood and waste tires while providing electrical energy to nearby households.  … Read more

FDEP Industrial Wastewater (NPDES) Permit Renewals

Wheelabrator building

Wheelabrator operates two waste-to-energy facilities in South Florida.  Each facility maintains a FDEP NPDES Individual Stormwater Permit for handling stormwater at the facility and potential discharges from the facility.  MBC provided the engineering services necessary to renew the existing FDEP (NPDES) Stormwater Permits for the facilities in accordance with Chapter 62-620 FAC.  

Outfall and Stormwater Facility Inspections

Storm water gate

This project included collection of information related to location, size, and type of outfall and stormwater facility. During inspections exact location, size, type, and condition of outfall and stormwater facility were recorded and compared with information on file.  Inspection services for FDOT’s outfall structures and stormwater facilities throughout Broward, Palm Beach, Martin, St. Lucie and … Read more