WTP Recarbonation System Replacement Design and Services During Construction
This project included design, bidding and construction services.
This project included design, bidding and construction services.
This project included data collection and review, design review and scheduling, permitting services and bidding services. MBC will provide engineering services during construction
This project included preliminary and final design, permitting and bidding.
This project included analyzing alternative installation configurations for the flow meters and determining the best fit configuration to improve system operation and simplify maintenance.
This project included review of record drawings, preliminary design memorandum, construction drawings and technical specifications, permitting, and bidding services.
This project included design of a pigging station of a 48in raw water line, bidding services and construction administration services.
This project included preparation and submittal of a four-log virus treatment of groundwater. MBC also prepared construction drawings and permitting applications.
This project included replacement of two existing 6,000-gallon sodium hydroxide bulk storage tanks, pumps, piping, magnetic flow meters, and relater systems.
This project included design development, review of design documents, review of shop drawings and other construction-phase submittals, and project close-out.
MBC was responsible for design of pre- and post-treatement chemical systems, as well as startup assistance for a 26 mgd nanofiltration process in parallel with a 3.5 mgd low pressure reverse osmosis membrane process.