Procurement of SRF Funding and Compliance Services During Construction of Water System Interconnect Upgrades
This project included the upgrade of four potable water system interconnects within the City’s service area.
This project included the upgrade of four potable water system interconnects within the City’s service area.
This project included design services for removal and replacement of valves, actuators, modifications to bypass piping, and additive alternates to modify filter feed and lower pressure distribution systems.
This project included geotechnical services, water main replacement, roadway and sidewalk improvements.
This project included replacement of membranes and pilot testing of the new membranes.
For this project MBC provided design and construction administration services.
This project included design, bidding and construction services.
This project included design. permitting,and bidding. MBC will provide engineering services during construction.
This project included replacement of two existing 6,000-gallon sodium hydroxide bulk storage tanks, pumps, piping, magnetic flow meters, and relater systems.
MBC was responsible for design of pre- and post-treatement chemical systems, as well as startup assistance for a 26 mgd nanofiltration process in parallel with a 3.5 mgd low pressure reverse osmosis membrane process.
In 2004, the City completed construction and commissioning of the 40 mgd NF membrane process addition to the City’s 70 mgd WTP. The original membrane elements for the plant were specially developed for the 2004 project by the membrane the membrane manufacturer, Hydranautics, which subsequently became the ESNA LF (low fouling) product line, the industry … Read more