Four-Log Virus Treatment Reassessment and Demonstration
Four-Log Virus Treatment Reassessment and Demonstration
Membrane Pretreatment Pressure Filter System Expansion Design
Country Club Village Infrastructure Improvement Design (iSIP)
Raw Water Transmission System Flushing Connection Design and SDCs
Water Treatment Plant Washwater Recovery Upgrades Design
Membrane Element Replacement
Lime Softening Chemical Building Renovation Study
Finished Water Disinfection and Chemical System Improvements
Broward County Water Treatment Plant 2A Four-Log Virus Treatment Demonstration
Pompano Beach Lime Softening Unit Replacement
Lake Worth Water Treatment Plant RO Membrane Element Replacement Evaluation and Selection
Gravity Filter System Rehabilitation
Seminole Tribe of Florida Hollywood Raw Water Supply Improvements
BCWWS WTP 3A Four Log System Services During Construction
Membrane Water Treatment Plant Pretreatment Pressure Filters Rehabilitation and Improvements
Margate Potable Water Interconnect Design and Services During Construction
Palm Aire Raw Water Main Pigging
Broward County Pump Station 3A Four-Log Virus Treatment
Broward County Water and Wastewater Master Plan
FDEP Injection Well Permit Renewal
Four Log Virus Treatment of Groundwater: Compliance Studies, Process Improvements, and Demonstrations Submittals
Unidirectional Flushing and Valve Exercising Program
Replacement of Sodium Hydroxide Tanks and Miscellaneous Improvements, Design and Construction
30.5 mgd WTP Membrane Conversion Chemical Systems Design and Plant Start-Up
40 mgd Nanofiltration Membrane Element Replacement
Rehabilitation of Steel Elevated Storage Tanks, Design and Construction
Demolition of Steel Elevated Storage Tank Design and Construction Services
Continuing Process Technical Expert Services
Alternative Water Supply Master Plan
Development of Hydraulic Model for Transmission/Distribution System
SFWMD Cost Estimating Study Phase I and II
4-Log Treatment and Federal Groundwater Rule (GWR) Compliance Consulting
6.0 migd Blue Hills Seawater Water Treatment Plant
10.5 mgd West WTP Reverse Osmosis Improvements
10.0 mgd Membrane Pressure Vessel Replacement
10.0 mgd Nanofiltration Membrane Replacement
Ground Storage Tank and High Service Pump Station
Anion Exchange Softening Process WTP 1A
Wastewater Treatment Plant Oxygen Generation System Upgrade Design-Build
Disinfection and Finished Water Blending Yard Piping Improvements
Water Ground Storage Tanks, Design and Construction Services
3.0 mgd LPRO Treatment, Raw Water Wells and Deep Well Injection Plant
40.0 mgd Membrane Softening Process Addition