Project URL: http://www.mcbrinson.com/wp-content/uploads/2023/06/P-20-COPB-NF-Process-Expansion-Study-1.pdf
Categories: Engineering Planning and Studies, Water and Wastewater Treatment Systems Design and Construction
Client: City of Pompano Beach
Completed Date: September 30, 2021
Evaluation and development of a conceptual phasing plan for expansion of the city’s existing 10.0 mgd nanofiltration process to an ultimate capacity of 30 mgd, including phasing out the existing lime softening process.